What does it mean to build a new treatment system?

Council builds and operates a treatment system that's able to meet drinking water standards.

To ensure the treatment plant is compliant we would have to include on-site water softening, cartridge filtration and validated ultraviolet (UV) treatment, together with power and communications upgrades, monitoring equipment and land access for the works.

Council would also be responsible for the water source, backflow prevention, emergency planning, trained operators, record keeping and a drinking water safety plan.

How much is it estimated to cost?

It is estimated to cost about $420,000 to build it, with an estimated annual $25,000 operating cost to ratepayers.

What are the pros of doing this?

  • Provides a compliant supply that would allow the campground to continue operating in its current form.
  • Gives Council the greatest control over the quality and operation of the supply.

What are the cons of doing this?

  • It is the most expensive option for ratepayers, estimated to be about $420,000 to build and $25,000 a year to operate.
  • Council would have a high level of responsibility for a small, complex, seasonal supply.
  • There is already limited amounts of water Council can extract from the water source at peak times and this option does not address that.
  • The treatment plant would likely be installed at the campground tanks, so any informal connections would be untreated and risk contaminating the supply, or we would to disconnect them.
  • How the treatment plant is paid for is unclear. If the campground operators funded it through the lease, it would add about $60,000 a year to the campground’s rent, and the campground directors have advised this is unaffordable. Funding through the general rate would mean all of the district's ratepayers are subsidising a supply with one permanent resident, that increase to 80 or 90 people at peak times in summer.